宜春干式变压器:ZGS9型组合式宜春干式变压器
ZGS9型组合式宜春干式变压器
现邮 箱:1262980066@qq.com以三相五芯柱式的ZGS9组合式宜春干式变压器为例,对其结构、使用及安装注意事项作一介绍。
1.组合式宜春干式变压器的结构
(1)前舱部分,前舱的面板左侧为高压脸,装有三相高压进线的肘形电缆头、高压负荷宜春干式变压器、无励磁分接宜春干式变压器、油浸插入式熔断器;面板右侧为低压舱,装有气体压力表、油位计,压力释放闸、绝缘油温度计、注油管塞、低压出线排等。高低压舱间装有安全屏蔽隔板。前舱外端装有两扇门,并且装有保证先打开低压侧门然后才能打开高压侧门的联锁机构。
(2)油箱,用来贮装宜春干式变压器油和宜春干式变压器器身。宜春干式变压器铁心由非晶合金带材或冷轧硅钢片卷绕或叠装而成.绕组由铜线或铜箔绕制,此箱可直接向外散发热量。
(3)冷却片,由波纹板或片式散热器制成。整个箱体全密封接地,非常安全。
由于组合式宜春干式变压器休积较小并采用了Dyn11联结,允许三相负载不平衡运行,能充分利用宜春干式变压器的供电能力,并能抑制三次谐波,改善供电质量。
2.安装时注意事项
1)首先要砌好一座相应容量的基础,并在其周围做好接地网,接地电阻值不大于4Ω,使装置可靠接地。
2)起吊时应同时使用箱体上四个吊耳。吊装时要小心轻放.其缆绳与垂直线的夹角不能大于30°,.以免造成箱体结构变形。
3)装置采用了油浸插入式熔断器和油浸限流式熔断器的全范围保护方式,做到三相互不干扰,且可在支路上安装一组隔离宜春干式变压器.供组合式宜春干式变压器停电时抢修用,而无需再装高压熔断器.但对三相三柱式组合式宜春干式变压器在高压配电线路上还是不能取消高压熔断器,以确保高压配电线路的安全运行。
ZGS9 type combined transformer
Column is the three-phase five-core transformer ZGS9 combined, for example, its structure, use and installation notes for a description.
1 modular structure of the transformer
(1) part of the front cabin, cockpit left side of the high-pressure face of the panel, with three-phase high-voltage cable into the line of the elbow-shaped head, high-voltage load swi手 机:13287501888tch, no circuit tap, oil plug-in fuse; the right side panel low-pressure chamber, equipped with a gas pressure gauge, oil level gauge, pressure release gate, insulating oil thermometer, injection tubing plugs, low-pressure outlet row and so on. Between high and low cabin bulkhead with safety shield. EVA front end with two doors and side door with guaranteed low first and then open the side door to open high-pressure interlocking institutions.
(2) tanks, storage equipment for the body of transformer oil and transformer. From the amorphous alloy core transformer or cold-rolled silicon steel strip wound or stacked together. Winding consists of copper or copper foil around the system, this case can be directly radiated heat.
(3) cool piece, piece of corrugated board or heat sink made ??of. The box sealed ground, very safe.
As the combined transformer and uses a small plot off Dyn11 link, allowing the three-phase unbalanced load operation, make full use of the transformer power supply capacity, and can suppress the third harmonic, improve quality of supply.
2 Installation Notes
1) First, the capacity corresponding to Qi Hao a basis, and in its surrounding good grounding, grounding resistance is less than 4Ω, the reliable grounding device.
2) lifting the box should be used simultaneously on four lugs. Handle with care when lifting its cable and the vertical angle is not greater than 30 °,. So as to avoid structural deformation box.
3) The device uses a plug-in oil and oil-immersed current-limiting fuse fuse the full range of protection, so that phase without disturbing each other, and can be installed in the teams on the road a group of isolation switch. For combined transformer outage repair use, and no longer need to install high-voltage fuse, but the modular three-phase three-column transformer in high voltage distribution lines or high-voltage fuse can not be canceled to ensure the safe operation of high voltage distribution lines.
更多宜春干式变压器资讯:上海宜春干式变压器厂家宜春干式变压器产品宜春干式变压器资讯